Rehabilitation Of Dodo Pepesu – Nkwanta Road Project(46.4km) February 2015 (progress Photographs)

REHABILITATION OF DODO PEPESU – NKWANTA ROAD PROJECT(46.4Km)

FEBRUARY 2015 (PROGRESS  PHOTOGRAPHS)

Inspection of the Project Signboard by the Head of Delegation of the European Union (EU) to Ghana (Ambassador) at Km 0+000 at Dodo Pepesu.

C:\Users\ERIC\Pictures\transtech\SAM_4813.JPG

EU Ambassador witnessing the laying of the crushed rock base course with a mechanical paver at Km 43+700 (RHS) in Nkwanta town.

C:\Users\ERIC\Pictures\transtech\SAM_4812.JPG

EU Ambassador witnessing the laying of the crushed rock base course with a mechanical paver at Km 43+700 (RHS) in Nkwanta town.

C:\Users\ERIC\Pictures\transtech\SAM_4805.JPG

The SR explaining a point to the EU Ambassador during inspection of the constructed walkway and the cycle lane at 44+000 (LHS) in Nkwanta town.

C:\Users\ERIC\Pictures\transtech\SAM_4777.JPG

 EU Ambassador inspecting some sections of the road in Nkwanta town.

C:\Users\ERIC\Pictures\transtech\SAM_4799.JPG

EU Ambassador observing the constructed walkway and the cycle lane at Km 44+000 (LHS) in Nkwanta town.

C:\Users\HP\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Word\WP_20120901_004(1).jpg

Laying of crushed rock base course with a mechanical paver from Km. 43+075 – Km 44+000 (RHS) in Nkwanta town.

C:\Users\ERIC\Pictures\transtech\SAM_4819.JPG

Fixing of reinforcement for the underpass ramps at Km14+565 LHS in Brewaniase town.

Fixing of reinforcement for the underpass ramps in Brewaniase km14+565 LHS

C:\Users\ERIC\Desktop\FEB\DSC03669.JPG

Erection of reinforcement to the leg of the pedestrian underpass at Km. 14+565 (LHS) in Brewaniase town.

C:\Users\ERIC\Desktop\FEB\DSC03670.JPG

Erection of reinforcement to the leg of the pedestrian underpass at Km. 14+565 (LHS) in Brewaniase town.

C:\Users\ERIC\Desktop\FEB\DSC03671.JPG

Final sub base preparation from Km. 7+000 – Km 7+800 (LHS/RHS) prior to laying of crushed base course.

C:\Users\ERIC\Desktop\FEB\DSC03674.JPG

Final sub base preparation from Km. 5+250 – 4+999 (LHS) prior to laying of crushed rock base course.

C:\Users\ERIC\Desktop\FEB\DSC03673.JPG

Laying of precast concrete U-drain from Km. 46+300 – Km 46+350 (RHS) in Nkwanta town.

C:\Users\ERIC\Desktop\FEB\DSC03675.JPG

Casting  of concrete surround to access  culvert at km. 40+010 (LHS)

C:\Users\ERIC\Desktop\FEB\DSC03676.JPG

Laying of pavement blocks in cycle lanes and walkways from Km. 44+775 – Km 44+800 (LHS) in Nkwanta town.

C:\Users\ERIC\Desktop\FEB\DSC03680.JPG

Laying of crushed rock base course from Km. 42+825 – Km 43+075 (RHS) in Nkwanta town.

C:\Users\ERIC\Desktop\FEB\DSC03681.JPG

Compaction of crushed rock base course from Km. 42+825 – Km 43+075 (RHS) in Nkwanta town prior to priming.