REHABILITATION OF DODO PEPESU – NKWANTA ROAD PROJECT (46.4Km)
MAY 2015(PROGRESS PHOTOGRAPHS)
|
Final sub base preparation from Km 1+300 – Km. 0+500 (LHS/RHS).
|
|
Final sub base preparation from Km 1+300 – Km. 0+500 (LHS/RHS).
|
|
Final sub base preparation from Km 1+300 – Km. 0+500 (LHS/RHS).
|
|
Laying of non-mountable kerbs from Km. 46+125 – Km. 46+400 (RHS) in Nkwanta town.
|
|
Laying of paving blocks in bicycle lane and pedestrian walkway from Km 45+500 – Km 45+400 (LHS) in Nkwanta town. |
|
Laying of paving blocks in bicycle lane and pedestrian walkway from Km 45+500 – Km 45+400 (LHS) in Nkwanta town. |
|
Application of first seal from Km. 8+900 – Km. 8+525(LHS) in Fankyeneko town. |
|
Application of first seal from Km. 8+900 – Km. 8+525(LHS) in Fankyeneko town. |
|
Erection of reinforcement to walls of the underpass legs at Km. 45+120 (LHS) in Nkwanta town. |
|
Construction of bicycle lane and pedestrian walkway from Km. 44+025 – Km. 43+650 (RHS) |
|
Construction of bicycle lane and pedestrian walkway from Km. 44+025 – Km. 43+650 (RHS) in Nkwanta town. |
|
Construction of trapezoidal concrete lined drain from Km. 40+100 – Km. 40+375 (LHS). |
|
Laying and compaction of crushed stone base course from Km. 1+400 – Km. 0+075 (LHS). |
|
Covering of primed surfaces with quarry dust from Km. 2+025 – Km. 1+775 (LHS) prior to opening to vehicular traffic. |
|
Laying of crushed stone base course from Km. 1+400 – Km. 0+075 (RHS). |
|
|
Brooming of primed surfaces from Km. 8+400 – Km. 7+400 (LHS) prior to application of first seal. |
||||||
|
|
Application of first seal from Km. 8+400 – Km. 7+400 (LHS). |
||||||
|
|
Application of first seal from Km. 8+400 – Km. 7+400 (LHS). |
||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
Erected road signs along the road corridor between Km. 0+000 and Km. 4+000 |
|||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
Erected road signs between Km. 4+000 and Km. 17+000 |
|||||||
|
|
|
||||||
|
|
|
||||||
|
|
|
||||||
|
Erected road signs between Km. 41+000 and Km. 46+400 in Nkwanta Town. |
|||||||
|
Laying of crushed stone base course from Km. 5+000 – Km. 4+500 (LHS).
|
|||||||
|
Compaction of crushed stone base course from Km. 5+000 – Km. 4+500 (LHS).
|
|||||||
|
Conduction of Field Density Test (FDT) on crushed stone base course from Km. 5+000 – Km. 4+500 (LHS) prior to priming.
|
|||||||
|
Final sub base preparation from Km. 3+500 – Km. 2+000 (LHS/RHS) in Dodo Tamale town prior to laying of crushed stone base course.
|
|||||||
|
Final sub base preparation from Km. 3+500 – Km. 2+000 (LHS/RHS) in Dodo Tamale town prior to laying of crushed stone base course.
|
|||||||
|
Final sub base preparation from Km. 3+850 – Km. 4+300(LHS/RHS) prior to laying of crushed stone base course.
|
|||||||
|
Final sub base preparation from Km. 3+850 – Km. 4+300(LHS/RHS) prior to laying of crushed stone base course.
|
|||||||
|
Construction of pedestrian walkway and bicycle lane from Km. 45+775 – Km. 45+550 (LHS) in Nkwanta town.
|
|||||||
|
Installation of pedestrian guardrails from Km. 45+650 – Km. 45+610 (LHS) in Nkwanta town.
|
|||||||
|
Laying of crushed stone base course from Km. 3+800 – Km. 3+550 (LHS).
|
|||||||
|
Laying of crushed stone base course from Km. 3+800 – Km. 3+550 (LHS).
|
|||||||
|
Compaction of crushed stone base course from Km. 3+800 – Km. 3+550 (LHS).
|
|||||||
|
Construction of Field Density Test (FDT) on completed crushed stone base course from Km. 3+800 – Km. 3+550 (LHS) prior to priming.
|
|||||||
|
Priming of crushed stone base course from Km. 3+800 – Km. 3+550 (LHS) in Dodo Tamale town.
|
|||||||
|
Covering of primed surfaces with quarry dust from Km. 3+800 – Km. 3+550 (LHS) in Dodo Tamale town prior to opening to traffic.
|
|||||||
|
Laying of crushed stone base course from Km. 3+600 – Km. 3+000 (RHS) in Dodo Tamale town.
|
|||||||
|
Compaction of crushed stone base course from Km. 3+600 – Km. 3+000 (RHS) in Dodo Tamale town.
|
|||||||
|
Priming of crushed stone base course from Km. 3+800 – Km. 3+325 (LHS). |
|||||||
|
Priming of crushed stone base course from Km. 3+800 – Km. 3+325 (LHS). |
|||||||
|
Covering of primed surfaces with quarry dust from Km. 3+800 – Km. 3+325 (LHS) prior to opening to traffic. |
|||||||
|
Conduction of Field Density Test(FDT) on completed crushed stone base course Km. 3+325 – Km. 2+800 (LHS) prior to priming. |
|||||||
|
Installation of pedestrian guardrails from km. 45+650 – Km. 45+500 (LHS) in Nkwanta town.
|
|||||||
|
Installation of pedestrian guardrails from km. 45+650 – Km. 45+500 (LHS) in Nkwanta town.
|
|||||||
|
Construction of pedestrian walkway and bicycle lane at bus bay section from Km 45+400 – Km. 45+320 (RHS) in Nkwanta town.
|