REHABILITATION OF DODO PEPESU – NKWANTA ROAD PROJECT (46.4KM)
DECEMBER 2014(PROGRESS PHOTOGRAPHS)
|
Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).
|
|
Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).
|
|
Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).
|
|
Scarification of existing bituminous surface from Km. 0+250 – Km. 0+050 (LHS/RHS).
|
|
Excavation for the ramp of the Underpass at Km. 45+120 in Nkwanta town. |
|
Installation of precast U-drain from Km. 44+050 – Km. 43+675 (LHS).
|
|
Installation of precast U-drain from Km. 44+050 – Km. 43+675 (LHS).
|
|
Construction of bicycle lane from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.
|
|
Construction of bicycle lane from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.
|
|
Construction of walkway from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.
|
|
Construction of cycle lane and walkway from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.
|
|
Installation of precast U-drains at Km 43+000(LHS). |
|
Construction of trapezoidal lined drain at Km42+700(LHS).
|
|
Final bed preparation and insitu testing for the Underpass at Km. 45+120 in Nkwanta town. |
|
Blinding works for the Underpass at Km. 45+120 in Nkwanta town. |