Rehabilitation Of Dodo Pepesu – Nkwanta Road Project (46.4km) December 2014

REHABILITATION OF DODO PEPESU – NKWANTA ROAD PROJECT (46.4KM)

 DECEMBER 2014(PROGRESS PHOTOGRAPHS)

G:\DCIM\Camera\IMG_20141210_130150.jpg

Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).

G:\DCIM\Camera\IMG_20141210_130244.jpg

Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).

G:\DCIM\Camera\IMG_20141210_130134.jpg

Application of first seal from Km. 12+300 – Km. 11+675 (LHS/RHS).

G:\DCIM\Camera\IMG_20141212_115303.jpg

Scarification of existing bituminous surface from Km. 0+250 – Km. 0+050 (LHS/RHS).

G:\DCIM\Camera\IMG_20141210_114638.jpg

Excavation for the ramp of the Underpass at Km. 45+120 in Nkwanta town.

G:\DCIM\Camera\IMG_20141210_113715.jpg

Installation of precast U-drain from Km. 44+050 – Km. 43+675 (LHS).

G:\DCIM\Camera\IMG_20141210_113715.jpg

Installation of precast U-drain from Km. 44+050 – Km. 43+675 (LHS).

G:\DCIM\Camera\IMG_20141211_130751.jpg

Construction of bicycle lane from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.

G:\DCIM\Camera\IMG_20141211_130735.jpg

Construction of bicycle lane from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.

Construction of walkway from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.

Construction of cycle lane and walkway from Km. 44+375 – Km. 44+075 (LHS) in Nkwanta town.

Installation of precast U-drains at

Km 43+000(LHS).

Construction of trapezoidal lined drain at Km42+700(LHS).

Final bed preparation and insitu testing for the Underpass at Km. 45+120 in Nkwanta town.

Blinding works for the Underpass at Km. 45+120 in Nkwanta town.